Projects

Infrastructure and social projects in Dipolog City from the DPWH transparency portal and the City Government of Dipolog's own procurement reports, procurement plan and older project pages. Each status is only as current as its source, so check the as-of date on every entry.

DPWH (national)

148

Live portal data retrieved October 25, 2026

City procurement reports

16

As of June 30, 2026 (transmitted July 29, 2026) · As of June 30, 2022 (transmitted July 14, 2022) · As of December 31, 2022

City 2026 procurement plan

7

Posted January 29, 2026

City pages (2013–2014, historical)

11

Historical: content dated December 31, 2013 · Historical: content from 2014

Statuses are copied from each source on its own date and are not live. The city's 2014 pages are shown as historical only; planned items from the 2026 procurement plan are plans, not proof that work has started.

Projects

182 Listed
For procurementRoads202626JC0032

CONSTRUCTION OF CONCRETE ROAD - JUNCTION 3003 STEPS TO LINABO PEAK LEADING TO TULWANAN VILLAGE (OLD TOWN SITE), DIPOLOG CITY, ZAMBOANGA DEL NORTE - STA. 4+780 - STA. 4+950

Location
Dipolog City (barangay not stated)
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering Office
Approved budget (ABC)
₱4,254,180.00
Dates
  • Advertised: Jul 15, 2026
Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source
For procurementBuildings & facilities202626JC0065

CONSTRUCTION OF MULTI-PURPOSE BUILDING (INDOOR SPORTS FACILITY) IN BARANGAY OLINGAN, DIPOLOG CITY, ZAMBOANGA DEL NORTE

Location
Olingan
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering Office
Approved budget (ABC)
₱14,850,000.00
Dates
  • Advertised: Jul 15, 2026
Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source
For procurementBuildings & facilities202626JC0061

CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CENTRAL, DIPOLOG CITY, ZAMBOANGA DEL NORTE, (8.58711, 123.34378)

Location
Central
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering Office
Approved budget (ABC)
₱2,970,000.00
Dates
  • Advertised: Jun 23, 2026
Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source
Awarded (notice to proceed issued)Buildings & facilities2026CEO/100-26-01-0002

1 lot Pakyaw Labor – Const. of Perimeter Niche Additional 100 units

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Engineer's Office (CEO)
Contract cost
₱408,102.25Approved budget (ABC): ₱409,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (3)
Dates
  • Invitation to bid posted: Jan 22, 2026
  • Bids opened: Jan 29, 2026
  • BAC resolution: Jan 29, 2026
  • Contract signed: Feb 4, 2026
  • Notice to proceed: Feb 4, 2026

Labor-only (pakyaw) contract; the PMR shows no separate notice of award date.

Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 3 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Roads2026CGSO/INFRA/26-01-0001

1 lot Rehab./Installation of Streetlights @ Boulevard

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City General Services Office (CGSO)
Contract cost
₱9,872,450.28Approved budget (ABC): ₱9,873,395.44Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Pre-procurement conference: Jan 20, 2026
  • Invitation to bid posted: Jan 27, 2026
  • Pre-bid conference: Feb 3, 2026
  • Bids opened: Feb 19, 2026
  • Notice of award: Feb 24, 2026
  • Contract signed: Mar 6, 2026
  • Notice to proceed: Mar 13, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 4 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Water, sanitation & irrigation2026CPDO/INFRA-26-01-0021

1 lot Gen. Req. for Waste Water Filtration Tank

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Planning and Development Office (CPDO)
Contract cost
₱2,099,374.91Approved budget (ABC): ₱2,100,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Pre-procurement conference: Jan 27, 2026
  • Invitation to bid posted: Feb 3, 2026
  • Pre-bid conference: Feb 10, 2026
  • Bids opened: Feb 24, 2026
  • Notice of award: Feb 26, 2026
  • Contract signed: Apr 13, 2026
  • Notice to proceed: Apr 13, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 5 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Buildings & facilities2026CPDO/INFRA-26-02-0044

50 cu.m. Hauling of Embankment Works Construction additional 150 units Pauper Niche

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Planning and Development Office (CPDO)
Contract cost
₱1,999,714.64Approved budget (ABC): ₱2,000,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Pre-procurement conference: Feb 10, 2026
  • Invitation to bid posted: Feb 17, 2026
  • Pre-bid conference: Feb 24, 2026
  • Bids opened: Mar 10, 2026
  • Notice of award: Mar 12, 2026
  • Contract signed: Mar 26, 2026
  • Notice to proceed: Apr 13, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 8 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Schools2026CEO/INFRA-26-03-0163

1 lot Concrete/Masonry Works – Completion of Sta. Isabel ES Outdoor Stage

Location
Sta. Isabel
Implementer / office
City Government of Dipolog · City Engineer's Office (CEO)
Contract cost
₱599,500.00Approved budget (ABC): ₱600,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Invitation to bid posted: Mar 10, 2026
  • Bids opened: Mar 17, 2026
  • Notice of award: Mar 19, 2026
  • Contract signed: Mar 26, 2026
  • Notice to proceed: Apr 1, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 9 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Ports2026CPDO/INFRA-26-02-0126

1 lot Gen. Req. Const./Improvement Port Facility of Dipolog City

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Planning and Development Office (CPDO)
Contract cost
₱9,994,867.80Approved budget (ABC): ₱10,000,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Pre-procurement conference: Feb 19, 2026
  • Invitation to bid posted: Feb 26, 2026
  • Pre-bid conference: Mar 5, 2026
  • Bids opened: Mar 19, 2026
  • Notice of award: Mar 24, 2026
  • Contract signed: Apr 13, 2026
  • Notice to proceed: Apr 20, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 9 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Bridges2026CPDO/INFRA-26-02-0132

1 lot Gen. Req. Concrete Retrofitting of Footbridge

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Planning and Development Office (CPDO)
Contract cost
₱1,699,500.00Approved budget (ABC): ₱1,700,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Invitation to bid posted: Mar 3, 2026
  • Pre-bid conference: Mar 10, 2026
  • Bids opened: Mar 24, 2026
  • Notice of award: Apr 6, 2026
  • Contract signed: Apr 20, 2026
  • Notice to proceed: May 4, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 10 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Buildings & facilities2026CEO/INFRA-26-03-0158

480 sq. m. Demolition Works & Rehab. Of Bldg. Bus Terminal

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Engineer's Office (CEO)
Contract cost
₱1,749,963.26Approved budget (ABC): ₱1,750,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Invitation to bid posted: Mar 5, 2026
  • Pre-bid conference: Mar 12, 2026
  • Bids opened: Mar 26, 2026
  • Notice of award: Apr 6, 2026
  • Contract signed: Apr 7, 2026
  • Notice to proceed: Apr 23, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 10 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Buildings & facilities2026BRGY. ESTAKA/BE-2026-01-008

1 lot Excavation Works – Improvement of Covered Court

Location
Estaka
Implementer / office
City Government of Dipolog · Barangay Estaka
Contract cost
₱1,799,500.00Approved budget (ABC): ₱1,800,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (L)
Dates
  • Invitation to bid posted: Mar 31, 2026
  • Pre-bid conference: Apr 7, 2026
  • Bids opened: Apr 23, 2026
  • Notice of award: Apr 28, 2026
  • Contract signed: Jul 2, 2026
  • Notice to proceed: Jul 3, 2026

Listed in the city PMR with Barangay Estaka as end-user.

Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 13 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Flood control & drainage2026CPDO/INFRA-26-05-0344

1 lot Gen. Req. – Const. of 165 mtrs drainage canal along Lobing Ogis

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Planning and Development Office (CPDO)
Contract cost
₱1,692,000.00Approved budget (ABC): ₱1,692,385.93Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (2)
Dates
  • Invitation to bid posted: May 14, 2026
  • Pre-bid conference: May 21, 2026
  • Bids opened: Jun 4, 2026
  • Notice of award: Jun 19, 2026
  • Contract signed: Jun 26, 2026
  • Notice to proceed: Jun 30, 2026
Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 20 · As of June 30, 2026 (transmitted July 29, 2026)View source
Awarded (notice to proceed issued)Water, sanitation & irrigation2026CCAH/TF-26-01-0010

1 lot Rehabilitation of the Sewage Treatment Plant - REBID

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · Corazon C. Aquino Hospital (CCAH)
Contract cost
₱3,788,000.00Approved budget (ABC): ₱3,788,000.00Fund source: GoP (as written in the PMR; not further specified)Mode: Competitive (L)
Dates
  • Pre-procurement conference: Jan 27, 2026
  • Invitation to bid posted: Jun 18, 2026
  • Bids opened: Jun 25, 2026
  • Notice of award: Jul 3, 2026
  • Contract signed: Jul 10, 2026
  • Notice to proceed: Jul 22, 2026

End-user is the city-run Corazon C. Aquino Hospital. The PMR is titled "as of June 30, 2026" but this row already carries July 2026 award dates; it also shows a pre-bid conference date of 2/10/26, earlier than the 6/18/26 posting (omitted here).

Source: Procurement Monitoring Report, January–June 2026 (PMR 1st Sem CY2026), page 22 · As of June 30, 2026 (transmitted July 29, 2026)View source
Planned for 2026 (Annual Procurement Plan)Buildings & facilities2026

SPA I City Mayor's Office - Construction of Dipolog Commercial Complex Including Site Development

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱3,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Buildings & facilities2026

SPA I - City Mayor's Office - City Housing Project at Brgy. Gulayon

Location
Gulayon
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱1,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Health2026

SPA I - City Mayor's Office - Construction of Corazon C. Aquino Hospital

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱5,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Buildings & facilities2026

SPA I City Mayor's Office - Office Building - Construction of Dipolog City Hall and Purchase of other related equipment

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱1,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Ports2026

SPA I City Mayor's Office - Construction of Galas Port

Location
Galas
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱20,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Ports2026

SPA I City Mayor's Office - Ports, lighthouses & harbors-construction of galas feeder port (Expansion of dipolog city port project)

Location
Galas
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱226,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 5 · Posted January 29, 2026View source
Planned for 2026 (Annual Procurement Plan)Buildings & facilities2026

SPA I City Mayor's Office - Building & others structures-Cons. Sports complex

Location
Dipolog City (barangay not stated)
Implementer / office
City Government of Dipolog · City Mayor's Office (CMO)
Planned budget (APP)
₱2,000,000.00Fund source: General FundMode: Competitive Bidding
Dates
  • Planned procurement start: Jan 2026
  • Planned procurement end: Dec 2026

Listed as an infrastructure project in the city's 2026 APP. Inclusion in the APP is a plan to procure, not proof the project has started.

Source: Annual Procurement Plan for FY 2026, page 4 · Posted January 29, 2026View source
On-going (49.5% accomplished)Buildings & facilities202525JC0096

COMPLETION OF MULTI-PURPOSE BUILDING (WOMEN CENTER) BRGY. COGON, DIPOLOG CITY, ZAMBOANGA DEL NORTE

Location
Cogon
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering OfficeContractor: A.P.A. CONSTRUCTION
Contract cost
₱2,880,366.24Approved budget (ABC): ₱2,970,000.00Fund source: Regular Infra - GAA 2025 SSP
Dates
  • Advertised: Mar 4, 2025
  • Awarded: May 13, 2025
  • Started: May 29, 2025
  • Contract expiry: Sep 20, 2025

The DPWH portal still lists this project as on-going (49.5% accomplished) although its contract expiry date (September 20, 2025) has passed.

Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source
On-going (80% accomplished)Roads202525JC0012

CONSTRUCTION OF CONCRETE ROAD - JUNCTION 3003 STEPS TO LINABO PEAK LEADING TO TULWANAN VILLAGE (OLD TOWN SITE), ZAMBOANGA DEL NORTE

Location
Dipolog City (barangay not stated)The DPWH description does not name Dipolog City; included because it names Dipolog barangays or landmarks (Linabo Peak).
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering OfficeContractor: DIPOLOG TOP CONSTRUCTION & DEVT. CORP
Contract cost
₱39,175,312.83Approved budget (ABC): ₱39,200,000.00Fund source: Regular Infra - GAA 2025 CP
Dates
  • Advertised: Nov 3, 2024
  • Awarded: Mar 6, 2025
  • Started: Mar 24, 2025
  • Contract expiry: Sep 5, 2025

The DPWH portal still lists this project as on-going (80% accomplished) although its contract expiry date (September 5, 2025) has passed.

Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source
On-going (0.49% accomplished)Health202525JC0122

CONSTRUCTION OF ONE (1) STOREY - SCHOOL CLINIC (HEALTH FACILITY) AT SICAYAB ELEMENTARY SCHOOL, SICAYAB, DIPOLOG CITY, ZAMBOANGA DEL NORTE

Location
Sicayab
Implementer / office
DPWH Zamboanga del Norte 2nd District Engineering OfficeContractor: NALE CONSTRUCTION
Contract cost
₱4,110,976.27Approved budget (ABC): ₱4,118,595.02Fund source: Outside Infra - GAA 2025 DEPED BEFF
Dates
  • Advertised: Mar 4, 2026
  • Awarded: Jun 22, 2026
  • Started: Jul 15, 2026
  • Contract expiry: Oct 23, 2026

The DPWH portal still lists this project as on-going (0.49% accomplished) although its contract expiry date (October 23, 2026) has passed.

Source: DPWH Infrastructure Projects Portal (transparency.dpwh.gov.ph) · Live portal data retrieved October 25, 2026View source